56.2m Oceanco SHALAWATY official Y.CO archival exterior publicity photograph November 2026
Y.CO details the winter refit of 56.2m Oceanco SHALAWATY, including six-cabin accommodation, renewed guest spaces and upgraded zero-speed stabilisation.
Y.CO has outlined an extensive winter refit programme for SHALAWATY, the 56.2-metre Oceanco motor yacht previously known as THE WELLESLEY. The project, described on the brokerage's charter listing and verified on 18 November 2026, is directed towards preparing the yacht for the 2027 Mediterranean season. The announced changes encompass guest accommodation, principal salon and dining spaces, the beach club and technical equipment. Among the most consequential features is a flexible upper-deck room that can function either as a sixth guest cabin or as a massage room. The brokerage also identifies an upgrade to the yacht's zero-speed stabilisation equipment. Its published summer rate starts at €230,000 per week. The announcement concerns work underway over the winter and should not be mistaken for confirmation that the refit has been completed or that all new facilities are presently available for inspection.
Built in 1993, SHALAWATY has a beam of 9.08 metres, draught of 3.1 metres and declared volume of 651 gross tonnes. The yacht therefore represents an earlier generation of large Oceanco construction rather than a recently delivered yacht whose general arrangement can be altered with the benefit of a completely new platform. Its existing structure, services and distribution of space establish the framework in which the refit will take place. For a yacht that has already operated for more than three decades, the attraction of continued investment lies in the opportunity to retain distinctive elements while improving the facilities most relevant to the next stage of ownership. The precise technical choices depend on the condition of the existing construction and the space available for the altered systems. Y.CO has not announced the shipyard carrying out the programme or provided a contract value, detailed engineering specification or confirmed redelivery date.
The conversion of an upper-deck space is especially important for the commercial operation of the yacht. A room that can function as a guest cabin when required and a massage room at other times expands the possibilities for charter arrangements without necessarily dedicating separate permanent rooms to both activities. The value of that flexibility depends on the practical details of the finished room. Privacy, storage, access to its bathroom and the positions of fixed furniture all contribute to its suitability as overnight accommodation. When used for treatments, the room must also allow sufficient working space for the relevant equipment and personnel. The brokerage has not disclosed a detailed design or final dimensions. A charter manager should therefore confirm the proposed configuration with the yacht team before promising a particular arrangement to a client. Conversion times and storage of equipment may also influence the way the crew handles the transition between the two uses.
The existing arrangement incorporates two principal cabins, a feature retained in the brokerage's description of the yacht's future offering. The presence of more than one substantial suite can be appealing to two households travelling together or an extended family whose members value relatively independent accommodation. It should not be assumed that the suites have identical dimensions, facilities or access to exterior spaces. A guest's preference may depend on the level at which the room is situated and its proximity to shared living areas. Y.CO's planned accommodation includes six cabins for up to twelve guests, with a combination of principal suites, a VIP cabin and double and twin arrangements. The final layout should be checked after the refit, particularly where the use of the convertible room is critical to the group's requirements. Crew accommodation is listed for twelve, indicating the scale of the service and technical team ordinarily associated with the yacht.
The yacht's decorative identity draws on the atmosphere and materials associated with 1920s London, including darker timber finishes and leather. Updating those interiors raises the question of which elements should be preserved and which should change. A refit may involve the renewal of decorative surfaces, fabrics or lighting without altering every aspect of the original arrangement. More extensive intervention can affect fixed joinery, electrical equipment and associated services. The brokerage identifies the main salon and dining room as areas of work but does not specify the final materials or project designer. For an established charter yacht, a considered approach can preserve an identifiable character while addressing the wear associated with frequent guest use. It may also improve the flexibility of the spaces for different groups. The quality of the finished rooms will depend on the completed installation, rather than simply appearing in a description of planned work on a booking website.
The beach club is another identified focus of the winter project. At sea level, a yacht's swim platform and adjacent spaces can serve as the point of embarkation for tenders and a base for a wide range of guest activities. Their effectiveness depends on the practical distribution of equipment, the accessibility of the water and the arrangements for securing loose items between periods of use. An older yacht may present different limitations from a design conceived from inception around a large beach club. The available area has to accommodate the activities intended for it without creating conflicts with essential operational routes. SHALAWATY's listing describes a substantial inventory of tenders, personal watercraft, boards and inflatable equipment. Any changes to their handling and storage arrangements should be confirmed after completion. The announced improvements provide an opportunity to consider the relationship between that inventory and the area from which it will be deployed.
Y.CO identifies upgraded stabilisation for periods at anchor among the technical works planned during the winter. For guests spending consecutive days in anchorages, reliable control of vessel motion can materially influence the use of its dining rooms, cabins and exterior areas. However, the performance of any stabilisation system depends on the vessel's characteristics, the installation and prevailing conditions. An upgrade might involve changes to existing fins, control electronics, hydraulic machinery or other elements, but the scope cannot be inferred from the short description provided. The yacht's engineers will need to assess the integration of the equipment with the vessel's existing systems and confirm its operating limitations. The completion of a successful programme should include appropriate commissioning, testing and documentation. The published announcement does not name the supplier or disclose technical performance measurements. It is therefore appropriate to describe upgraded equipment as part of the planned refit, not as a verified improvement of a stated numerical magnitude.
A winter refit creates a period during which a charter yacht is unavailable to guests while work is undertaken, with a defined commercial incentive to complete the project before the principal summer market. The timing of decisions about materials, equipment and work sequencing can have important consequences for the delivery date. A change to one room may require work to adjacent spaces or to systems that serve other parts of the vessel. Procurement delays or discoveries during dismantling may also affect an agreed schedule. The charter manager should maintain an appropriate relationship between marketing commitments and actual project progress rather than assume that every prospective booking can be accepted without reference to completion. Appropriate time must remain for trials, final cleaning, equipment familiarisation and preparation of guest accommodation. The announcement establishes the intended winter programme and direction of the commercial offering but does not establish an unconditional commitment to a particular spring delivery date.
Y.CO lists SHALAWATY for summer operation in the Mediterranean, including the eastern and western parts of the region, from €230,000 per week. The advertised hire rate is a starting figure and does not establish a final quotation or the availability of an individual date. Charges and arrangements associated with the proposed itinerary should be confirmed with the brokerage. For clients comparing yachts in the 50-to-60-metre sector, the updated facilities and presence of two principal suites may be particularly relevant to the choice of vessel. The new upper-deck configuration will also merit attention when the party requires six separate rooms. The central development is the announced investment in preserving and updating an established Oceanco charter yacht for the next season. Its final appeal will become clearer once the project has been completed and the revised accommodation, technical installations and exterior facilities can be inspected in their finished condition.
Primary source: Y.CO official SHALAWATY charter listing and winter refit update, checked 18 November 2026.
Image: Y.CO, official SHALAWATY brokerage publicity imagery. Broker-supplied edited exterior image; not a photograph of the completed winter refit. Official source.
Explore
Go deeper into the yachts, companies, events and destinations directly connected to this article.
Continue reading
Y.CO announces exceptional July and August 2027 Mediterranean charter availability for 69.4m FIREBIRD, with summer rates from €575,000 per week.
Y.CO lists the 2008 Benetti DILARA at €310,000 per week, with new charter imagery reported in November and a distinctive split-level owner's suite.
Y.CO presents revised Art Deco interiors and a 55-foot Valhalla chase boat on SAMADHI, with Caribbean winter charter rates starting at US$450,000 per week.
Y.CO advertises a US$1 million weekly Thanksgiving charter on 95.2m Lürssen WHISPER, with Caribbean positioning and a published €1.2 million standard rate.
Superyacht Guide
Continue into the wider Superyacht Guide.
Business opportunities · Superyacht Guide
Companies serving the superyacht market can discuss clearly identified advertising, sponsorship and business-profile opportunities. Commercial activity remains separate from independent editorial coverage.