Superyacht Commissioning, Harbour Acceptance Tests & Sea Trials: Test Plans, System Proving & Handover
Commissioning turns completed refit work into verified operating capability by proving that each system is installed, configured, protected and integrated as intended. Reliable acceptance testing defines prerequisites and acceptance criteria before the test, distinguishes factory, harbour and sea-trial objectives, uses calibrated instrumentation, records operating conditions and results, controls temporary overrides and unresolved defects, verifies alarms and protective functions by approved methods, and closes testing only when failed items are retested and the final as-built configuration is accepted.