Tankoa lists its 45m T450 hull C114 in the 2026 delivery group. The current builder entry gives 450 GT but does not confirm launch, delivery or owner handover.
Tankoa's published under-construction portfolio still lists the 45-metre T450 hull C114 in its 2026 delivery group. Its place on the list is a programme status, not a report of a launch or a transfer to an owner today.
The yard identifies this entry by construction number C114, alongside an overall length of 45 metres and a listed volume of 450 GT. It is not the T450 Singolare launched earlier, and the different hull numbers should remain distinct in any yacht database.
The builder places C114 with projects carrying 2026 delivery years rather than showing a dated handover announcement. This is a useful snapshot for project tracking, but it does not prove the vessel has entered service.
At 45 metres, the T450 belongs to Tankoa's metal-yacht programme rather than the smaller production-yacht market. The group also shows another T450, C125, in the later on-spec portfolio, which illustrates why a model name alone cannot identify a particular build.
The yard's general shipyard information describes its custom construction approach in Genoa and its additional Civitavecchia operations. Individual construction allocation, crew accommodation and owner finishes for C114 remain undisclosed in the current public entry.
Tankoa explicitly reserves the detailed information for this project, so no guest cabin count, interior designer or final machinery is attributed to hull C114 here. Model-family imagery may convey the general T450 form, but it is not evidence of the as-built vessel's configuration.
Prospective buyers and industry partners need a current specification and construction report from the shipyard to distinguish design intent from commissioned equipment. A year without a specific date also leaves room for subsequent changes to the programme.
The published 2026 grouping is the defensible fact to record now, while sea trials, acceptance and owner delivery require separate confirmation. Claims about a new sale or a completed transaction would go beyond the official material available.
This update links to the yard's public construction schedule and names C114 clearly to avoid merging its record with other 45-metre Tankoa projects. Its hero is the builder's verified C114 project illustration rather than an image of Singolare.
Official references: www.tankoa.com; www.tankoa.com. This account distinguishes a published source record from a fresh launch, new sale or delivered handover.
Explore
Go deeper into the yachts, companies, events and destinations directly connected to this article.
Continue reading
Project Y729 is Oceanco’s 80m, 2,600 GT first Simply Custom yacht, with a confirmed outfitting programme and planned 2027 delivery.
AvA's official fleet now separates delivered 25.7m Kando85 V from available Kando85 Two, which remains under construction in the builder's listing.
Sanlorenzo's published 58Steel record confirms delivery of Perla Lunar and construction of a second hull, alongside details of the model's diesel-electric system.
Moonen's tenth 122 Martinique, YN208, remains in construction and available at €27 million, with a June 2027 delivery target and customisation opportunities.
Superyacht Guide
Continue into the wider Superyacht Guide.
Business opportunities · Superyacht Guide
Companies serving the superyacht market can discuss clearly identified advertising, sponsorship and business-profile opportunities. Commercial activity remains separate from independent editorial coverage.